Open-plan kitchen extension with a vaulted roof lantern, built by 4orty Construction
Residential / Renovations

House Renovations in Scarborough

Whole-house renovations managed start to finish, from planning drawings through to the final coat of paint.

The job, in full

What's included

Structural alterations, extensions and internal reconfiguration

Planning and building control liaison where the project needs it

Single point of contact managing every trade on site

Fixed-price stage payments, agreed before work begins

Why 4orty Construction

Whole-house renovation is where a lot of local firms hand off between subcontractors and nobody owns the finish. We run the project as a single team from strip-out to snagging, so the person who quoted the job is the person accountable for it.

See the full project: Open-Plan Kitchen Extension
Bespoke shaker kitchen cabinetry with a black range cooker beneath a hand-built oak mantel and white metro-tile splashbackIn progressFinished

What a house renovation covers

A renovation with us can be one room or the whole house. At the small end it is a single space taken back to the walls and rebuilt. At the large end it is structure, wiring, plumbing, plastering, joinery, a kitchen and bathrooms, all running through one programme.

What makes it a renovation and not a string of separate jobs is the order. Each trade leaves the house ready for the next, and one person decides that order.

The order of work on a whole-house renovation

Strip-out comes first, and it is when an old house tells you what it has been hiding. Structural alterations follow: walls out, steels in, floors and roof timbers repaired. Then first-fix plumbing and electrics, while everything is still open.

Plastering closes the walls up. Second-fix joinery, the kitchen and the bathrooms go in on finished surfaces. Decoration is last, then a snagging round before we call it done. Because our joiners, plasterers, plumbers and electricians work as one team, a change found at strip-out is dealt with by the people on site that day.

Renovating period properties and homes in conservation areas

We take on period houses, including those in conservation areas. The practical differences are materials and permissions. Solid walls are usually better finished in lime than modern gypsum plaster, and timber details are made to match in our workshop.

If the house is listed, any work that affects its character, inside or out, needs listed building consent before it starts. Tell us at the first visit and we plan the programme around the consent.

Building control and certificates

Most of a renovation is hidden once it is finished, so the paperwork matters. Structural alterations need building regulations approval and inspection. A rewire or any new circuit is notifiable under Part P and has to be certified. We deal with building control during the job, so you finish with the certificates a future buyer's solicitor will ask for.

Quotes, stages and one point of contact

You get a written quote after a site visit, with fixed-price stage payments agreed before work begins. Each payment is tied to a stage of the build, and the timeline is written down stage by stage.

The person who quoted the job runs it. That is who you ring, and that is who is accountable when the last coat of paint is dry.

Common questions

Straight answers on renovations.

Many single-storey rear extensions fall under permitted development, up to 4 metres for a detached house or 3 metres for a semi-detached or terraced house, but there are conditions on height, boundary proximity and prior use of permitted development rights. We check this against your specific property before quoting, since getting it wrong can mean retrospective applications later.

Get in touch

Ready to talk through your renovations project?

Get in touch and we'll arrange a site visit to scope the work properly before quoting.