Bathroom Fitters in Scarborough
Strip-out to final silicone in one continuous job, with every trade already on the team.
The job, in full
What's included
Full strip-out and disposal of the old suite
First-fix plumbing and electrics, including underfloor heating and extractor fans
Tiling, wet room tanking and waterproofing to the correct standard
Suite, shower enclosure and joinery fitted, then a full snag before we leave
Why us
Most bathroom problems show up a year later, at the tanking, the falls or the extractor. Because our plumbers, electricians, tilers and joiners are one team, nobody is finishing over someone else's shortcut.
How our bathroom fitters run the job
A bathroom is small, so the order matters more than anywhere else in the house. The old suite, tiles and flooring come out and are taken away. With the room bare, pipework and cabling are moved to the new positions and tested while they can still be reached.
Walls and floor are then made flat, sound and waterproof where they need to be, and tiled. The suite, shower enclosure and any joinery go in last, followed by sealing and a full snag. Before we start we tell you how many days you will be without a working bathroom.
Wet rooms and walk-in showers
A wet room is a floor that has to behave like a shower tray. It is laid to a fall so water runs to the drain, tanked with a waterproof layer under the tiles, and carried up the walls around the shower. None of that is visible when the room is finished, and all of it decides whether the ceiling below stays dry.
Because the same team does our structural work, we can strengthen or re-level a timber floor before it is tanked instead of tiling over a problem.
Electrics and ventilation: the regulations in a bathroom
Bathrooms are treated as a special location for electrics. Adding to or altering a circuit within the zones around a bath or shower is notifiable under Part P of the building regulations, so the work has to be certified, not just completed.
A new or refitted bathroom also needs mechanical extraction of at least 15 litres a second to the outside. An undersized or badly ducted fan is one of the commonest causes of mould in an otherwise good bathroom, which is why we treat it as part of the build and not an extra.
What affects the scope of a bathroom renovation
A straight swap, with the bath, basin and toilet staying where they are, is the simplest job. Moving the toilet means moving the soil pipe, and that decides a lot about the new layout. Large-format tiles need flatter walls than small ones. An electric shower or underfloor heating may need a new circuit.
The other variable is what is behind the old tiles, which nobody can see until strip-out. If you are supplying your own suite, we go through the measurements and the parts list with you first.
Bathroom installation in Scarborough and the nearby towns
We fit bathrooms, en-suites and wet rooms from our base in Scarborough across to Whitby, Filey, Bridlington, Malton, Pickering and Driffield. Many are part of a bigger job, such as an en-suite in a loft conversion or a bathroom moved during a renovation, and are quoted within it.
Related services
Often part of the same job as bathrooms, and done by the same team.
- KitchensKitchens designed around how you actually cook, built by the same team from first sketch to final fit.
- PlasteringFlat walls and clean ceilings, whether it is one room or a whole house.
- RenovationsWhole-house renovations managed start to finish, from planning drawings through to the final coat of paint.
- Damp ProofingWe find the cause first, fix it, then put the room back properly.
Areas we cover
Based in Scarborough. We also take on bathrooms work in:
Common questions
Straight answers on bathrooms.
A like-for-like bathroom refit typically takes 1 to 2 weeks. A full renovation with layout changes, a wet room conversion or moved drainage usually takes 2 to 3 weeks. We tell you how many days you'll be without a working bathroom before we start.
Either. We can supply and fit from our trade suppliers, or fit a suite you have already bought. If you are buying your own, we will check the measurements and the parts list with you first so nothing holds the job up.
Yes. A wet room needs the floor tanked and laid to a fall, proper drainage and the right extraction. It is a job where the preparation underneath matters more than the tiles on top, which is why it is done by the same team that does our structural work.
