Residential / Driveways

Driveways in Scarborough

A driveway is only as good as what is underneath it, so that is where we start.

The job, in full

What's included

Excavation, compacted sub-base and drainage designed for the site

Block paving, resin-bound and tarmac finishes

Edging, kerbs, steps and dropped-kerb applications where needed

Old surface broken out and removed

Why us

Driveways fail from below: a thin sub-base, no drainage, or edging that lets the surface spread. We treat the groundwork as the job and the surface as the finish, which is the same way we build patios and foundations.

Block paving, resin or tarmac: choosing a driveway finish

Block paving is individual blocks laid on a sand bed inside a fixed edge. It can be lifted and relaid if a pipe needs digging up, and comes in the widest range of patterns. Resin-bound is stone mixed with resin and trowelled to a smooth, joint-free surface that water can drain through. Tarmac is the quickest to lay over a large area and the most forgiving on a slope.

We lay all three. The right one depends on the gradient, how the water leaves the site, and what the drive has to carry.

The groundwork under a driveway

The old surface is broken out and taken away. We then dig down to firm ground and build back up with a compacted stone sub-base, because the surface on top can only be as stable as that layer. Edging or kerbs are set in concrete around the perimeter to stop the drive spreading under the weight of cars.

Levels are set so the finished surface sits below the damp-proof course of the house and falls away from the walls.

Drainage and the front-garden rule

Rainwater from a new drive has to go somewhere other than the road. That is the reason for the planning rule on front gardens, and it is why drainage is designed before the finish is chosen. The options are a permeable surface, a fall to a lawn or border, or a channel drain to a soakaway within the plot.

Dropped kerbs in Scarborough and the East Riding

If the new drive needs a new or wider crossing over the pavement, that is a separate permission. A dropped kerb has to be approved by the highway authority, which is North Yorkshire Council for Scarborough, Whitby, Filey, Malton and Pickering, and East Riding of Yorkshire Council for Bridlington and Driffield. We include the application in the job where one is needed.

What affects how long a driveway takes

Size and the amount of digging are the main factors. After that it is the weather: resin cannot be laid in rain and needs time to cure before a car goes on it. We tell you in the quote how long you will be parking on the street.

Common questions

Straight answers on driveways.

Not if the surface is permeable, or if rainwater drains to a lawn or border rather than the road. A new impermeable driveway over 5 square metres that drains to the highway does need permission. Resin-bound and correctly laid block paving are both permeable options.

Get in touch

Ready to talk through your driveways project?

Get in touch and we'll arrange a site visit to scope the work properly before quoting.

5.0 · 8 Google reviews