An extra bedroom or office without moving house, built to building regulations by one team.
The job, in full
What's included
Survey of head height, roof structure and staircase position before quoting
Structural steels, new floor joists and roof alterations, including dormers
Fire-rated doors, escape windows and stair design to building regulations
Insulation, electrics, plastering and joinery finished as one job
Why us
A loft conversion lives or dies on the structure and the stair. We design both before we price anything, so you know it fits and complies before a single joist is ordered.
Rooflight and dormer loft conversions
The simplest conversion keeps the roof shape and adds rooflights. It suits a loft that already has good head height, and it disturbs the house least. A dormer builds out from the roof slope to add standing room and floor area, and is the usual answer when a bedroom and an en-suite both need to fit.
Either way the work underneath is the same: a new floor structure, a stair, insulation, electrics, plastering and joinery, all done by our own team.
The survey: head height, roof structure and the stair
We survey before quoting. The first measurement is head height, from the top of the ceiling joists to the underside of the ridge; around 2.2 metres is the usual test. The second is how the roof is built. A traditional cut roof with rafters and purlins leaves open space to work with. A trussed roof has webs across the loft and needs more structural work to open up.
Then there is the stair. It has to land somewhere on the floor below without ruining a bedroom, and we draw that before pricing anything.
Building regulations for a loft conversion
Every loft conversion needs building regulations approval, with or without planning permission. Existing ceiling joists are not designed as a floor, so new joists and usually steel beams carry the room. On a semi-detached or terraced house, beams that bear on the shared wall mean serving notice on the neighbour under the Party Wall etc. Act 1996.
Fire safety drives much of the design. A new storey needs a protected route down the stairs to an outside door, with fire doors onto it and mains-powered, interlinked smoke alarms on every level. The stair can be no steeper than 42 degrees, and in a loft the headroom over it may be reduced to 1.9 metres at the centre of the flight and 1.8 metres at the side. We handle the application, the inspections and the completion certificate.
Planning: permitted development and conservation areas
Many loft conversions are permitted development. That does not apply in a conservation area or a National Park, where any roof extension needs a planning application. It matters locally: the old centres of Whitby and Filey, among others, sit inside conservation areas. We check the address before quoting.
Living in the house while the loft is built
Scaffolding goes up first, and the early weeks happen from outside and above: structure, floor, dormer and roof. Breaking through for the new stair is normally one of the later jobs, which keeps most of the dust and disruption out of the rooms you are living in.
Related services
Often part of the same job as loft conversions, and done by the same team.
- House ExtensionsOne team takes the extension from the first drawing to the last coat of paint, so nothing gets lost between trades.
- RoofingRoof repairs and flat roofing done right, from a single storm-damaged section to a complete pitched roof replacement.
- RenovationsWhole-house renovations managed start to finish, from planning drawings through to the final coat of paint.
- PlasteringFlat walls and clean ceilings, whether it is one room or a whole house.
Areas we cover
Based in Scarborough. We also take on loft conversions work in:
Common questions
Straight answers on loft conversions.
Many loft conversions fall under permitted development, provided the added roof space stays within the volume limits (40 cubic metres for a terraced house, 50 for detached or semi-detached) and no extension goes beyond the plane of the existing roof slope at the front. Conservation areas and listed buildings are different. Building regulations approval is always required.
The usual test is around 2.2 metres of head height at the highest point, measured from the top of the existing ceiling joists to the underside of the ridge. Roof shape, water tank position and where the new stair can land also matter. We check all of this at a free survey.
Most loft conversions take 6 to 10 weeks on site. Dormer conversions and those needing a lot of structural work sit at the longer end. The house stays liveable throughout, since most of the early work happens from above.