Open-plan kitchen extension with a vaulted roof lantern, built by 4orty Construction
Residential / House Extensions

House Extensions in Scarborough

One team takes the extension from the first drawing to the last coat of paint, so nothing gets lost between trades.

The job, in full

What's included

Permitted development and planning checked against your property before we quote

Foundations, structural steel, roof and weatherproof shell

Electrics, plumbing, plastering, glazing and joinery by the same team

Building control inspections booked and passed as part of the job

Why us

An extension is really six trades in sequence, and the gaps between them are where budgets and timelines slip. We run every stage ourselves, so the person who quoted the job is on site when the steel goes in and when the kitchen goes back.

Single-storey, two-storey and kitchen extensions

We build rear and side extensions on one or two storeys, and kitchen extensions that open the back of the house into a single room. The open-plan kitchen extension in our projects is the last kind: a new space built onto the original kitchen under a vaulted roof lantern, with the kitchen fitted by the same team.

From drawings to building control sign-off

We work with local architectural designers for the drawings. Once the design is settled we submit the building regulations application and give you a fixed written quote for the build.

On site the order is foundations, walls and structural steel, roof, then windows and doors to make the shell weathertight. Electrics, plumbing, plastering and joinery follow inside. Building control inspects at set stages along the way, and we book each visit. The completion certificate at the end is the document a future buyer's solicitor will ask for.

Permitted development, planning and the neighbours

Permitted development covers many single-storey rear extensions, and a larger one, up to 8 metres on a detached house or 6 metres on any other, can go through the council's prior approval route. In a conservation area or a National Park the rules tighten: every side extension and any rear extension of more than one storey needs a planning application.

Two things outside planning catch people out. Digging foundations within 3 metres of a neighbour's building, and deeper than theirs, means serving notice under the Party Wall etc. Act 1996. And if a public sewer runs within 3 metres of the new foundations, the water company has to agree to the build-over. We check for both before the quote, not after the digger arrives.

What decides the scope and the programme

Ground conditions set the foundation design. The size of the opening into the existing house sets the steelwork. Moving a kitchen, a boiler or a soil stack adds trades and time. Planning, where it is needed, comes before any of it.

We agree a written stage timeline before work begins so you know what happens when.

Joining the new room to the old house

The hardest part of an extension to get right is the join. Brick, roof covering and window proportions need to sit with the original house, and inside, the floor levels, plaster and joinery should run through as if the room had always been there. Running every trade ourselves is what makes that possible.

Common questions

Straight answers on house extensions.

Often not. Many single-storey rear extensions fall under permitted development, up to 4 metres for a detached house or 3 metres for a semi-detached or terraced house, subject to height and boundary rules. Two-storey extensions, side extensions near a boundary, and anything in a conservation area or on a listed building usually need a full application. We check your property first and tell you which applies.