
House Extensions in Scarborough
One team takes the extension from the first drawing to the last coat of paint, so nothing gets lost between trades.
The job, in full
What's included
Permitted development and planning checked against your property before we quote
Foundations, structural steel, roof and weatherproof shell
Electrics, plumbing, plastering, glazing and joinery by the same team
Building control inspections booked and passed as part of the job
Why us
An extension is really six trades in sequence, and the gaps between them are where budgets and timelines slip. We run every stage ourselves, so the person who quoted the job is on site when the steel goes in and when the kitchen goes back.
Single-storey, two-storey and kitchen extensions
We build rear and side extensions on one or two storeys, and kitchen extensions that open the back of the house into a single room. The open-plan kitchen extension in our projects is the last kind: a new space built onto the original kitchen under a vaulted roof lantern, with the kitchen fitted by the same team.
From drawings to building control sign-off
We work with local architectural designers for the drawings. Once the design is settled we submit the building regulations application and give you a fixed written quote for the build.
On site the order is foundations, walls and structural steel, roof, then windows and doors to make the shell weathertight. Electrics, plumbing, plastering and joinery follow inside. Building control inspects at set stages along the way, and we book each visit. The completion certificate at the end is the document a future buyer's solicitor will ask for.
Permitted development, planning and the neighbours
Permitted development covers many single-storey rear extensions, and a larger one, up to 8 metres on a detached house or 6 metres on any other, can go through the council's prior approval route. In a conservation area or a National Park the rules tighten: every side extension and any rear extension of more than one storey needs a planning application.
Two things outside planning catch people out. Digging foundations within 3 metres of a neighbour's building, and deeper than theirs, means serving notice under the Party Wall etc. Act 1996. And if a public sewer runs within 3 metres of the new foundations, the water company has to agree to the build-over. We check for both before the quote, not after the digger arrives.
What decides the scope and the programme
Ground conditions set the foundation design. The size of the opening into the existing house sets the steelwork. Moving a kitchen, a boiler or a soil stack adds trades and time. Planning, where it is needed, comes before any of it.
We agree a written stage timeline before work begins so you know what happens when.
Joining the new room to the old house
The hardest part of an extension to get right is the join. Brick, roof covering and window proportions need to sit with the original house, and inside, the floor levels, plaster and joinery should run through as if the room had always been there. Running every trade ourselves is what makes that possible.
Related services
Often part of the same job as house extensions, and done by the same team.
- KitchensKitchens designed around how you actually cook, built by the same team from first sketch to final fit.
- Loft ConversionsAn extra bedroom or office without moving house, built to building regulations by one team.
- RenovationsWhole-house renovations managed start to finish, from planning drawings through to the final coat of paint.
- RoofingRoof repairs and flat roofing done right, from a single storm-damaged section to a complete pitched roof replacement.
Areas we cover
Based in Scarborough. We also take on house extensions work in:
Common questions
Straight answers on house extensions.
Often not. Many single-storey rear extensions fall under permitted development, up to 4 metres for a detached house or 3 metres for a semi-detached or terraced house, subject to height and boundary rules. Two-storey extensions, side extensions near a boundary, and anything in a conservation area or on a listed building usually need a full application. We check your property first and tell you which applies.
A straightforward single-storey rear extension typically takes 8 to 12 weeks on site once foundations start. A two-storey extension or one that opens up the existing kitchen usually runs 12 to 20 weeks. Planning, if needed, adds around 8 weeks before that. We agree a written stage timeline before work begins.
Yes. We work with local architectural designers for the drawings, submit the building regulations application, and book each building control inspection as the job progresses. You get one point of contact for the whole thing.
